053165 Accession Number: 053165

Description

Eight ton concrete blocks drying in the sun, which will be used to anchor the boom defence nets in the Manton dam.

Details

Accession Number
053165
Classification
Photograph
Object Type
Black & white - Print silver gelatin
Physical Description
Colour: Black & white
Date Made
3 July 1943
Place Made
Whole/Part
Whole
Item Count
1
Copyright
Copyright expired - public domain

Conflicts

Places

Tags

Accession 053165

More like this

053166

Photograph 053166 Second World War, 1939-1945

Newly made eight ton concrete blocks curing in the sun. These will be used to anchor the boom defence nets across Darwin Harbour and the recently completed Manton dam, located about 70 Kilometres sout

053090

Photograph 053090 Second World War, 1939-1945

As a war precaution, Australian Army Engineers, in cooperation with the Naval Boom Commander, installed a boom defence system against aerial torpedoes in the Manton dam. The vehicle is a 30 CWT K seri

053139

Photograph 053139 Second World War, 1939-1945

DARWIN, NT. 1943-07-01. ONE TON FOUR HUNDREDWEIGHT OF WIRE ROPE TO BE USED AS A "JACK STAY" FOR ANCHORING THE BOOM ON MANTON DAM.

053091

Photograph 053091 Second World War, 1939-1945

As a war precaution, Australian Army Engineers, in cooperation with the Naval Boom Commander, installed a boom defence against aerial torpedoes in the Manton dam, south of Darwin. The engineers are in

053135

Photograph 053135 Second World War, 1939-1945

DARWIN, NT. 1943-07-01. BOOM DRUMS USED TO SUPPORT UNDERWATER NET ON MANTON DAM. THIS BOOM IS TO COUNTER AERIAL TORPEDO ATTACK. THE TWO TEMPORARY PYLONS CAN ALSO BE SEEN.

053452

Photograph 053452 Second World War, 1939-1945

DARWIN, NT. 1943-07-06. VIEW OF BOOM WORKING VESSEL, HMAS "KOALA". WEED ENCRUSTED 9 TON CONCRETE ANCHOR OF BOOM NET CAN BE SEEN IN THE RIGHT FOREGROUND, WHICH HAS BEEN LIFTED FOR INSPECTION AND CLEANI

See more similar items →

Record information

Last modified: 2 February 2024 - 12.53 am