111285
Photograph 111285 Second World War, 1939-1945MANGGAR, BORNEO, 9 JULY 1945. VIEW OF MANGGAR RIVER BRIDGE IN 2/14 INFANTRY BATTALION AREA, WHICH WAS WRECKED BY RETREATING JAPANESE DURING THE OBOE 2 OPERATION. THE BRIDGE IS NOW BEING REPAIRED.

The Australian War Memorial Collection. Test site
MANGGAR, BORNEO, 5 JULY 1945. THE MAIN BRIDGE OVER THE MANGGAR RIVER IN 2/13 INFANTRY BATTALION AREA WHICH WAS DESTROYED BY RETREATING JAPANESE DURING THE OBOE 2 OPERATION.
MANGGAR, BORNEO, 9 JULY 1945. VIEW OF MANGGAR RIVER BRIDGE IN 2/14 INFANTRY BATTALION AREA, WHICH WAS WRECKED BY RETREATING JAPANESE DURING THE OBOE 2 OPERATION. THE BRIDGE IS NOW BEING REPAIRED.

MANGGAR, BORNEO, 5 JULY 1945. MANGGAR, BORNEO, 5 JULY 1945. MATILDA TANKS OF 3 TROOP, A SQUADRON, 1 ARMOURED REGIMENT BEING LANDED FROM BARGES NEAR THE MANGGAR RIVER BRIDGE DURING THE OBOE 2 OPERATION

MANGGAR, BORNEO, 5 JULY 1945. MATILDA TANKS OF 3 TROOP, A SQUADRON, 1 ARMOURED REGIMENT BEING LANDED FROM BARGES NEAR THE MANGGAR RIVER BRIDGE DURING THE OBOE 2 OPERATION. THEY ARE TO SUPPORT 2/14 INF

MANGGAR AREA, BORNEO, 17 JULY 1945. MEMBERS OF 2/6 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, ASSEMBLING SECTIONS OF BAILEY BRIDGE WHICH THEY ARE USING TO SPAN A GAP IN THE BRIDGE ACROSS THE MANGGAR-B

MANGGAR AREA, BORNEO, 17 JULY 1945. MEMBERS OF 2/6 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, ASSEMBLING SECTIONS OF BAILEY BRIDGE WHICH THEY ARE USING TO SPAN A GAP IN THE BRIDGE ACROSS THE MANGGAR-B

MANGGAR, BORNEO, 5 JULY 1945. MEMBERS OF 2/5 FIELD REGIMENT FIRING THEIR 25 POUNDERS ON JAPANESE POSITIONS BETWEEN THE META FEATURE AND THE KUPAK FEATURE IN SUPPORT OF THE ATTACK BY 2/33 INFANTRY BATT
