Description
BUMI RIVER, NEW GUINEA. 1943-10-19. ENGINEERS OF THE 2/3RD AUSTRALIAN FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, CONSTRUCTING A NEW BRIDGE OVER THE RIVER TO REPLACE THE ONE WHICH WAS WASHED AWAY THE NIGHT BEFORE BY A "FLASH" FLOOD. THEY ARE PLACING LOGS USED FOR THE BRIDGE PLATFORM INTO POSITION. SHOWN: VX74842 SAPPER (SPR) E. E. SATCHWELL (1); NX39137 SPR W. J. SERCOMBE (2); NX29554 SPR R. KIRK (3); VX69256 SPR W. AYTON (4); NX89136 SPR T. H. WHITBY (5); SX1139 SPR J. H. LEA (6); NX7310 SPR E. DICKER (7); SPR DAY, 2/24TH AUSTRALIAN FIELD PARK COMPANY (8); SPR BARNES, 2/24TH AUSTRALIAN FIELD PARK COMPANY (9); NX91799 SPR R. E. NAGEL (10); SX1844 LANCE CORPORAL CRADDOCK (11).
Details
Classification
Photograph
Physical Description
Colour: Black & white
Copyright
Copyright expired - public domain
Conflicts
Places
Units
Tags