093372 Accession Number: 093372

Description

BARGES HILL, CENTRAL BOUGAINVILLE, 1945-06-26. A FUNICULAR RAILWAY IS BEING CONSTRUCTED BY 23 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, TO CARRY EQUIPMENT UP OVER THE HILL. HERE, THEY ARE LIFTING AN ENGINE OUT OF A JEEP FOR MANHANDLING OVER THE RIDGE. IDENTIFIED PERSONNEL ARE:- GNR K. URWIN (1); BDR N. HEALEY, 2 MOUNTAIN BATTERY (2); WO 2 R.C. BROGAN (3).

Details

Accession Number
093372
Classification
Photograph
Object Type
Negative
Physical Description
Colour: Black & white
Whole/Part
Whole
Item Count
1
Copyright
Copyright expired - public domain

Conflicts

Places

Units

Tags

Accession 093372

More like this

093371

Photograph 093371 Second World War, 1939-1945

BARGES HILL, CENTRAL BOUGAINVILLE, 1945-06-26. A FUNICULAR RAILWAY IS BEING CONSTRUCTED BY 23 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, TO CARRY EQUIPMENT UP OVER THE HILL. HERE, THEY ARE LIFTING AN E

093367

Photograph 093367 Second World War, 1939-1945

BARGES HILL, CENTRAL BOUGAINVILLE, 1945-06-26. GNR K. URWIN (1) AND L-BDR N. HEALEY (2), MEMBERS OF 2 MOUNTAIN BATTERY DISMANTLING JEEPS FOR TRANSPORTATION OVER THE RIDGE TO THE ROAD HEAD BY A FUNICUL

093374

Photograph 093374 Second World War, 1939-1945

BARGES HILL, CENTRAL BOUGAINVILLE, 1945-06-26. TRUCKS ON THE WAY UP THE FUNICULAR RAILWAY WHICH IS BEING CONSTRUCTED BY 23 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, TO CARRY EQUIPMENT UP OVER BARGES

093368

Photograph 093368 Second World War, 1939-1945

BARGES HILL, CENTRAL BOUGAINVILLE, 1945-06-26. THE BEGINNING OF THE FUNICULAR RAILWAY BEING CONSTRUCTED BY 23 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, WHICH TRANSPORTS SUPPLIES OVER THE RIDGE TO FOR

093369

Photograph 093369 Second World War, 1939-1945

BARGES HILL, CENTRAL BOUGAINVILLE, 1945-06-26. THE FUNICULAR RAILWAY BEING CONSTRUCTED BY 23 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, WHICH TRANSPORTS SUPPLIES OVER THE RIDGE TO FORWARD TROOPS. THIS

093375

Photograph 093375 Second World War, 1939-1945

BARGES HILL, CENTRAL BOUGAINVILLE, 1945-06-26. A FUNICULAR RAILWAY IS BEING CONSTRUCTED BY 23 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, TO CARRY EQUIPMENT UP OVER THE HILL. SHOWN IS THE TUBULAR SCAFF

See more similar items →

Record information

Last modified: 2 July 2026 - 2.05 am