P02024.021 Accession Number: P02024.021

Description

Aerial view of the Darwin Detachment complex which was established at Vestey's meatworks at Fannie Bay. While based here, the Detachment built the four emplacements for the 6 inch Mark VII naval gun batteries at East Point and Emery Point, coastal artillery defence emplacements.

Details

Accession Number
P02024.021
Photographer
Unknown
Classification
Photograph
Physical Description
Colour: Black & white
Date Made
c August 1933
Place Made
Whole/Part
Whole
Item Count
1
Credit Line
Donor I. Watts
Copyright
Copyright expired - public domain

Conflicts

Places

Units

Tags

Accession P02024.021

More like this

P02024.032

Photograph P02024.032 Period 1930-1939

Darwin, NT. c. 1934. Elevated view of two coastal defence artillery emplacements with guns pointed away from the sea. These 6 inch Mark VII naval guns, transferred from Thursday Island, are of the sam

P03984.001

Photograph P03984.001 Period 1930-1939

An elevated view of one of the (BL) 6 inch Mark XI Counter Bombardment guns recently constructed at Emery Point - B Battery. The gun is mounted on a concrete block and is of the same type used on the

P03984.003

Photograph P03984.003 Period 1930-1939

Unidentified members of the Royal Australian Artillery at work constructing the Emery Point Engine Room at No 1 Barracks Block. Construction of coastal defences at Emery Point was undertaken after it

P03984.004

Photograph P03984.004 Period 1930-1939

Unidentified members of the Royal Australian Artillery at work constructing the Emery Point Engine Room at No 1 Barracks Block. Construction of coastal defences at Emery Point was undertaken after it

P03984.002

Photograph P03984.002 Period 1930-1939

Two unidentified members of the Royal Australian Artillery attaching a lightning conductor to the rooftop of No 1 Barracks Block at Emery Point. Construction of coastal defences at Emery Point was und

P03984.005

Photograph P03984.005 Period 1930-1939

Unidentified members of the Royal Australian Artillery manoeuvre the No 4 engine on planks of wood to get it down the bank before installation in the Emery Point Engine Room. Construction of coastal d

See more similar items →

Record information

Last modified: 1 May 2023 - 2.31 am