011769 Accession Number: 011769

Description

EACH OF THE FINISHED GRANT M-3 MEDIUM TANKS THAT ROLLS DAILY OUT OF THE U.S. TANK ARSENALS GETS A THOROUGH GUN TEST BEFORE IT LEAVES THE FACTORY. M-3 MEDIUM TANKS ARE 18 FEET LONG, HAVE 40,000 PARTS. INTO EACH TANK GOES ENOUGH MATERIAL TO MAKE 45 AUTOMOBILES.

Details

Accession Number
011769
Photographer
Unknown Australian Official Photographer
Classification
Photograph
Object Type
Negative
Physical Description
Colour: Black & white
Date Made
20 March 1942
Whole/Part
Whole
Item Count
1
Copyright
Copyright expired - public domain

Conflicts

Tags

Accession 011769

More like this

011776

Photograph 011776 Second World War, 1939-1945

TANKS LEAVE THE FACTORY. THE LAST STEP IN THE MANUFACTURE OF GRANT M-3 MEDIUM TANKS IS TO LIFT THEM BY CRANE INTO FLAT CARS, CLAMP THEM DOWN AND COVER THEM WITH TARPAULIN. CARS LOADED WITH SWIFT U.S.

011767

Photograph 011767 Second World War, 1939-1945

BEHIND THE CHRYSLER TANK ARSENAL IN DETROIT, MICHIGAN, 28-TON GRANT M-3 MEDIUM TANKS ARE TESTED ON A MILE LONG, FIGURE-EIGHT CONCRETE TRACK. TESTS INCLUDE A SEVENTY FIVE MILE ROAD TEST WITH BACKING, F

2/3 Motor Transport Company and POW Bicycle Camp at Batavia

Film F03456 Second World War, 1939-1945

Reel 1. Liverpool, NSW January 1941. Roadways of old corrugated iron huts. Free French were being held. General camp scenes. Parade ground with 2/3rd Motor Transport Company and 2/3/ Motor Ambulance C

Armoured sweep in Vietnam DPR/TV/1235

Film F04421 Vietnam, 1962-1975

The Australian Army in Vietnam has mounted a full-scale armoured operation against enemy for the first time since World War II. Forty-four armoured vehicles and two hundred and seventy men are sweepi

See more similar items →

Record information

Last modified: 20 July 2026 - 3.40 am