013129 Accession Number: 013129

Description

AFTER FORMING AND DRILLING READY FOR ASSEMBLY THE STEEL SHEETS ARE WEIGHED BEFORE DESPATCH. (NEGATIVE BY BOTTOMLEY).

Details

Accession Number
013129
Photographer
Classification
Photograph
Object Type
Negative
Physical Description
Colour: Black & white
Date Made
c June 1942
Place Made
Whole/Part
Whole
Item Count
1
Copyright
Copyright expired - public domain

Conflicts

Tags

Accession 013129

More like this

012674

Photograph 012674 Second World War, 1939-1945

STEEL HELMET MANUFACTURE IN AUSTRALIA. HELMETS ARE THOROUGHLY LACQUERED AFTER FORMING AND THEY ARE SHOWN HERE STACKED FOR DRYING. (NEGATIVE BY BOTTOMLEY).

013130

Photograph 013130 Second World War, 1939-1945

MANY OF THE STEEL SHEETS ARE USED FOR ANDERSON TYPE AIR-RAID SHELTERS, AND HERE WE SEE A 14 GAUGE STEEL SHEET BEING CORRUGATED TO GIVE ADDED STRENGTH. PREVIOUSLY GALVANISED, THESE SHEETS ARE NOW SUPPL

010145

Photograph 010145 Second World War, 1939-1945

HERD TESTING. AFTER THE MILK IS WEIGHED, A SAMPLE IS DRAWN OFF BY MEANS OF A PIPETTE, BEFORE IT IS MEASURED OFF INTO A TEST-TUBE. (NEGATIVE BY C. BOTTOMLEY).

013195

Photograph 013195 Second World War, 1939-1945

DESPATCH RIDERS AT UNIT HEADQUARTERS SLEEP BESIDE THEIR MACHINES, READY TO TAKE MESSAGES AT ANY HOUR OF THE DAY OR NIGHT. ARMOURED DIVISION EXERCISES. (NEGATIVE BY BOTTOMLEY).

012295

Photograph 012295 Second World War, 1939-1945

A WOMAN INSPECTOR CHECKING OWEN GUNS AFTER ASSEMBLY. (NEGATIVE BY C. BOTTOMLEY).

007280

Photograph 007280 Second World War, 1939-1945

COMMONWEALTH AIRCRAFT FACTORY. THE FIRST STAGE OF ASSEMBLY OF SHEET METAL PARTS. SHEET METAL PARTS, FORMED BY DROP HAMMERS AND PRESSES AFTER DRILLING AND PAINTING, PUT TOGETHER IN SUB-ASSEMBLIES. (NEG

See more similar items →

Record information

Last modified: 20 July 2026 - 2.58 am