013363 Accession Number: 013363

Description

ARMY ENGINEERS LANDING MATERIAL FOR BUILDING A ROADWAY OVER SOFT GROUND FOR ARMY VEHICLES TO PASS OVER AFTER NEGOTIATING A PONTOON BRIDGE. (NEGATIVE BY TURNER).

Details

Accession Number
013363
Photographer
Classification
Photograph
Object Type
Negative
Physical Description
Colour: Black & white
Date Made
8 October 1942
Place Made
Whole/Part
Whole
Item Count
1
Copyright
Copyright expired - public domain

Conflicts

Places

Units

Tags

Accession 013363

More like this

013359

Photograph 013359 Second World War, 1939-1945

NIGHT MANOEUVRES. ARMY ENGINEERS LANDING ROLLS OF MATTING TO LAY A ROADWAY OVER SOFT GROUND WHEN A PONTOON BRIDGE WAS CONSTRUCTED ACROSS A RIVER DURING A MOCK BATTLE AT A N.S.W. CAMP. (NEGATIVE BY TUR

013362

Photograph 013362 Second World War, 1939-1945

NIGHT MANOEUVRES. ARMY MANOEUVRES AT A N.S.W. ENGINEERS' TRAINING CAMP. AN ADVANCE PARTY MAKING A LANDING PRIOR TO CONSTRUCTING A PONTOON BRIDGE ACROSS A RIVER. (NEGATIVE BY TURNER).

013361

Photograph 013361 Second World War, 1939-1945

NIGHT MANOEUVRES. ARMY ENGINEERS CONTRUCTING A PONTOON BRIDGE DURING A MOCK NIGHT ATTACK AT A N.S.W. TRAINING CAMP. (NEGATIVE BY TURNER).

013358

Photograph 013358 Second World War, 1939-1945

NIGHT MANOEUVRES. ARMY ENGINEERS CONSTRUCTING A PONTOON BRIDGE DURING A SURPRISE NIGHT ATTACK AT AN N.S.W. TRAINING CAMP. (PHOTOGRAPHED BY TURNER).

128915

Photograph 128915 Second World War, 1939-1945

QASMIYE AREA, SYRIA. 1941-06. AFTER DEMOLITION OF THE BRIDGE OVER THE LITANI RIVER BY THE VICHY FRENCH FORCES ENGINEERS OF 2/6TH FIELD COMPANY, ASSISTED BY INFANTRYMEN, BUILT A PONTOON BRIDGE DURING T

H03844

Photograph H03844 First World War, 1914-1918

Syria. c. 1917. Australian Army Engineers building the shore installation for one end of a pontoon bridge which will cross the river.

See more similar items →

Record information

Last modified: 21 July 2026 - 5.31 am