060818
Photograph 060818 Second World War, 1939-1945KAIRI, QLD. 1943-11-19. KAIRI DIVISION CAMP EASTERN PICTURE THEATRE RECENTLY COMPLETED BY ENGINEERS OF THE 54TH AUSTRALIAN DEPUTY COMMANDER ROYAL ENGINEERS (WORKS).

The Australian War Memorial Collection. Test site
KAIRI, QLD. 1943-11-19. BUILDINGS ERECTED BY THE ENGINEERS OF THE 54TH AUSTRALIAN DEPUTY COMMANDER ROYAL ENGINEERS (WORKS) FOR UNITS IN THE NORTHERN AREAS.
KAIRI, QLD. 1943-11-19. KAIRI DIVISION CAMP EASTERN PICTURE THEATRE RECENTLY COMPLETED BY ENGINEERS OF THE 54TH AUSTRALIAN DEPUTY COMMANDER ROYAL ENGINEERS (WORKS).

KAIRI, QLD. 1943-11-19. KAIRI DIVISION CAMP WESTERN PICTURE THEATRE COMPLETED BY ENGINEERS OF THE 54TH AUSTRALIAN DEPUTY COMMANDER ROYAL ENGINEERS (WORKS) SHOWN IS: VX110858 WARRANT OFFICER CLASS 2 N.

ATHERTON, QLD. 1943-11-19. QX33467 CORPORAL J. N. ARUNDEL, DRAUGHTSMAN OF THE 54TH. AUSTRALIAN DEPUTY COMMANDER ROYAL ENGINEERS (WORKS) PREPARING TRACINGS FOR BLUEPRINTS.

ROCKY CREEK, QLD. 1943-11-19. THIS 50,000 GALLONS WATER TANK AT NO 2 PUMP STATION, ROCKY CREEK IS PART OF THE WATER SUPPLY SYSTEM FOR THE ROCKY CREEK AND TOLGA AREAS AND IS OPERATED BY THE 54TH AUSTRA

TOLGA, QLD. 1943-11-19. IGLOO STOREHOUSES OF 200 FEET X 100 FEET ERECTED BY THE 54TH AUSTRALIAN DEPUTY COMMANDER ROYAL ENGINEERS (WORKS) FOR ORDNANCE AND ERGINEERING WORKSHOPS AT TOLGA. STRUCTURAL WOR

ROCKY CREEK, QLD. 1943-11-19. THE DRYING OUT BEDS, WITH THE PUMP HOUSE IN THE BACKGROUND, AT THE ROCKY CREEK SEWAGE TREATMENT WORKS, WHICH IS OPERATED BY THE 54TH. AUSTRALIAN DEPUTY COMMANDER ROYAL EN
