083898
Photograph 083898 Second World War, 1939-1945KAIRI, QUEENSLAND. 1944-12-01. 2/25 FIELD PARK COMPANY, ROYAL AUSTRALIAN ENGINEERS TROOPS ADJUSTING SWAY BRACES DURING THE EXPERIMENTAL CONSTRUCTION OF A BAILEY BRIDGE AT THEIR CAMP.

The Australian War Memorial Collection. Test site
KAIRI, QUEENSLAND. 1944-12-01. 2/25 FIELD PARK COMPANY, ROYAL AUSTRALIAN ENGINEERS TROOPS ADJUST TACKLES BEFORE LAUNCHING DURING THE EXPERIMENTAL CONSTRUCTION OF A BAILEY BRIDGE. THE BAYS SHOWN ARE THOSE ORIGINALLY CONSTRUCTED TO TAKE A TRACTOR.
KAIRI, QUEENSLAND. 1944-12-01. 2/25 FIELD PARK COMPANY, ROYAL AUSTRALIAN ENGINEERS TROOPS ADJUSTING SWAY BRACES DURING THE EXPERIMENTAL CONSTRUCTION OF A BAILEY BRIDGE AT THEIR CAMP.

KAIRI, QUEENSLAND. 1944-12-01. 2/25 FIELD PARK COMPANY, ROYAL AUSTRALIAN ENGINEERS PERSONNEL AT WORK ON THE TRACKWAY DURING THE EXPERIMENTAL CONSTRUCTION OF A BAILEY BRIDGE. THE TRACKWAY IS CARRIED BY

KAIRI, QUEENSLAND. 1944-12-01. CORPORAL J. HAYES, (1), ASSISTED BY A.H. GEORGE, (3), AND OTHER 2/25 FIELD PARK COMPANY, ROYAL AUSTRALIAN ENGINEERS TROOPS, POSITIONS A TRANSON DURING THE EXPERIMENTAL C

KAIRI, QUEENSLAND. 1944-12-01. SAPPER C. FRASER, 2/25 FIELD PARK COMPANY, ROYAL AUSTRALIAN ENGINEERS, DIGS A HOLE FOR A GANTRY POST DURING THE EXPERIMENTAL CONSTRUCTION OF A BAILEY BRIDGE.

KAIRI, QUEENSLAND. 1944-12-01. TROOPS OF THE 2/25 FIELD PARK COMPANY, ROYAL AUSTRALIAN ENGINEERS, WORKING UNDER THE GUIDANCE OF SERGEANT J. MCCHEGNEY, (10), ADJUST A 3/3 TACKLE DURING THE CONSTRUCTION

KAIRI, QUEENSLAND. 1944-12-01. SAPPER D.A. HANCOCK, (1), ASSISTED BY SAPPER D.F. SUTHERLAND, 2/25 FIELD PARK COMPANY, ROYAL AUSTRALIAN ENGINEERS, REMOVING A TRACKWAY DURING THE EXPERIMENTAL CONSTRUCTI
