092658 Accession Number: 092658

Description

MINGA CREEK, WEWAK AREA, NEW GUINEA. 1945-05-30. A TEMPORARY PONTOON BRIDGE IN THE MINGA CREEK AREA, CONSTRUCTED BY 2/8 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, UNDER COVER OF DARKNESS PRIOR TO THE SUCCESSFUL ATTACK ON WEWAK POINT. ALONGSIDE IS THE PARTLY CONSTRUCTED LOG AND STEEL MATTING BRIDGE.

Details

Accession Number
092658
Classification
Photograph
Object Type
Negative
Physical Description
Colour: Black & white
Whole/Part
Whole
Item Count
1
Copyright
Copyright expired - public domain

Conflicts

Places

Units

Tags

Accession 092658

More like this

092663

Photograph 092663 Second World War, 1939-1945

MINGA CREEK, WEWAK AREA, NEW GUINEA. 1945-05-30. GENERAL VIEW OF BRIDGE BEING CONSTRUCTED BY 2/8 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, SHOWING FRESHLY DRIVEN PILES AND PREPARATIONS IN PROGRESS FOR

092657

Photograph 092657 Second World War, 1939-1945

MINGA CREEK, WEWAK AREA, NEW GUINEA. 1945-05-30. MEMBERS OF 9 PLATOON, 2/8 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, HOISTING A HEAVY PILE UP ON A PILE DRIVER WHICH IS MOUNTED ON A 3-TON TRUCK AT MING

092013

Photograph 092013 Second World War, 1939-1945

WEWAK POINT, NEW GUINEA, 1945-05-12. THE 25-POUNDER OF 2/2 FIELD REGIMENT, ROYAL AUSTRALIAN ARMY, MOVING OVER THE BRIDGE OVER MINGA CREEK ON THE ROAD TO WEWAK POINT. THIS BRIDGE WAS BUILT BY 2/8 FIELD

092665

Photograph 092665 Second World War, 1939-1945

MINGA CREEK, WEWAK AREA, NEW GUINEA. 1945-05-30. A BULLDOZER OF 2/2 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, WIDENING A PARTLY CONSTRUCTED ROAD NEAR WIRUI MISSION. THIS WAS ORIGINALLY A JAPANESE ROAD

092662

Photograph 092662 Second World War, 1939-1945

MINGA CREEK, WEWAK AREA, NEW GUINEA. 1945-05-30. SAPPERS OF 2/8 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, USING A PORTABLE PILE DRIVER DURING BRIDGE BUILDING CONSTRUCTION. THE "DOLLY" IS RAISED TO A H

092014

Photograph 092014 Second World War, 1939-1945

WARINGE RIVER, WEWAK AREA, NEW GUINEA, 1945-05-13. SAPPERS OF 8 PLATOON, 2/8 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, CONSTRUCTING A PERMANENT BRIDGE BESIDE A TEMPORARY PONTOON BRIDGE OF FOLDING BOA

See more similar items →

Record information

Last modified: 2 July 2026 - 2.05 am