091056
Photograph 091056 Second World War, 1939-1945BOUGAINVILLE. 1945-04-18. 15 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS SAPPERS LAYING HEAVY DECKING ON TO BOX GIRDERS DURING THE CONSTRUCTION OF A 25-TON BRIDGE OVER DAWE CREEK.

The Australian War Memorial Collection. Test site
BOUGAINVILLE. 1945-04-18. 15 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS SAPPERS LAYING HEAVY DECKING ON TO BOX GIRDERS DURING THE CONSTRUCTION OF A 25-TON BRIDGE OVER DAWE CREEK. IDENTIFIED PERSONNEL ARE:- SAPPER A.S. ALLEN (1); CORPORAL C.G. PARR (2).
BOUGAINVILLE. 1945-04-18. 15 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS SAPPERS LAYING HEAVY DECKING ON TO BOX GIRDERS DURING THE CONSTRUCTION OF A 25-TON BRIDGE OVER DAWE CREEK.

BOUGAINVILLE. 1945-04-18. A 15 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS 3-TON TRUCK CARRYING HORN BEAMS AND DECKING FOR CONSTRUCTION OF A BOX GIRDER BRIDGE OVER DAWE CREEK. TRUCK IS BACKING DOWN TO TH

BOUGAINVILLE. 1945-04-18. A BULLDOZER WORKING WITH 15 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS TROOPS PULLING BOX GIRDER INTO POSITION OVER DAWE CREEK DURING THE CONSTRUCTION OF A 25-TON BRIDGE. 150 Y

BOUGAINVILLE. 1945-04-18. 15 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS SAPPERS STRAINING ON BLOCK AND TACKLE ATTACHED TO BOX GIRDER AS BULLDOZER PULLS GIRDER INTO POSITION OVER DAWE CREEK. IDENTIFIED P

BOUGAINVILLE. 1945-04-18. 15 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS SAPPERS MANHANDLING STEEL HORN BEAMS FROM TRANSPORT TO ROLLERS DURING THE CONSTRUCTION OF A BRIDGE ACROSS DAWE CREEK. THE BRIDGE W

BOUGAINVILLE. 1945-04-18. 15 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS MANHANDLING STEEL HORM BEAMS FROM TRANSPORT TO ROLLERS DURING THE CONSTRUCTION OF A BOX GIRDER BRIDGE OVER DAWE CREEK. THE BRIDGE
