P00998.027 Accession Number: P00998.027

Description

SUEZ CANAL, 1916. SS SUFFOLK (HMAT A23) PASSING THROUGH THE CANAL. NOTE THE PONTOON BRIDGE, BUILT BY THE 7TH AUSTRALIAN FIELD COMPANY ENGINEERS, WHICH HAD BEEN DISCONNECTED AND THE ENDS MOVED BACK ALONGSIDE THE BANKS TO ALLOW THE SHIP TO PROCEED.

Details

Accession Number
P00998.027
Classification
Photograph
Object Type
Print
Physical Description
Support: Paper (Fibre-based)
Whole/Part
Whole
Item Count
1
Copyright
Copyright expired - public domain

Conflicts

Places

Units

Tags

Accession P00998.027

Part of collection:

More like this

B03032

Photograph B03032 Period 1910-1919

A large steam ship passing through the pontoon bridge on the Suez Canal.

P00998.023

Photograph P00998.023 First World War, 1914-1918

SUEZ CANAL, 1916. CAMEL TRAIN CROSSING A PONTOON BRIDGE BUILT BY 7TH AUSTRALIAN FIELD COMPANY ENGINEERS.

A00970

Photograph A00970 First World War, 1914-1918

A group of soldiers watching a ship passing along the Suez Canal. The pontoon bridge in the foreground could be swung around to reach the far bank to allow the ships to pass.

P00998.007

Photograph P00998.007 First World War, 1914-1918

SUEZ CANAL, 1916. PONTOON BRIDGE OVER THE CANAL UNDER CONSTRUCTION BY MEMBERS OF THE 7TH AUSTRALIAN FIELD COMPANY ENGINEERS. NOTE DHOWS IN BACKGROUND.

J02664

Photograph J02664 First World War, 1914-1918

THE PONTOON BARREL BRIDGE, BUILT BY AUSTRALIAN ENGINEERS, ACROSS THE SUEZ CANAL AT SERAPEUM, 1916. (DONATED BY MR. R. SILLETT.)

P00998.028

Photograph P00998.028 First World War, 1914-1918

SUEZ CANAL, 1916. MEMBERS OF 7TH AUSTRALIAN FIELD COMPANY ENGINEERS MOVING SECTIONS OF A PONTOON BRIDGE INTO PLACE.

See more similar items →

Record information

Last modified: 17 September 2024 - 4.10 am