077469
Photograph 077469 Second World War, 1939-1945BABIANG ROAD, AITAPE AREA, NEW GUINEA. 1944-12-04. ENGINEERS OF NO. 9 PLATOON, 2/8TH FIELD COMPANY, BUILDING A COCONUT LOG BRIDGE ACROSS A STREAM ON THE AITAPE-DOGRETO ROAD.

The Australian War Memorial Collection. Test site
BABIANG ROAD, AITAPE, NEW GUINEA. 1944-12-04. A JEEP CROSSING A NEW BRIDGE BUILT BY TROOPS OF NO. 9 PLATOON, 2/8TH FIELD COMPANY, ON THE AITAPE-DOGRETO BAY ROAD.
BABIANG ROAD, AITAPE AREA, NEW GUINEA. 1944-12-04. ENGINEERS OF NO. 9 PLATOON, 2/8TH FIELD COMPANY, BUILDING A COCONUT LOG BRIDGE ACROSS A STREAM ON THE AITAPE-DOGRETO ROAD.

AITAPE AREA, NEW GUINEA. 1944-12-04. A BRIDGE ACROSS SOLUM CREEK BUILT BY ENGINEERS OF NO. 10 PLATOON, 2/14TH FIELD COMPANY, ON THE AITAPE-DOGRETO ROAD.

BABIANG ROAD, AITAPE, NEW GUINEA. 1944-12-04. THIS 234 FEET HIGH-LEVEL BRIDGE ACROSS THE DRINIUMOR RIVER BUILT BY ENGINEERS OF NO. 7 PLATOON, 2/8TH FIELD COMPANY, IN TEN DAYS.

AITAPE AREA, NEW GUINEA. 1944-12-04. ENGINEERS OF NO. 8 PLATOON, 2/8TH FIELD COMPANY, BUILDING A COCONUT LOG BRIDGE ACROSS A STREAM ON THE AITAPE-DOGRETO ROAD. IDENTIFIED PERSONNEL ARE:- QX33524 SAPPE

BABIANG ROAD, AITAPE, NEW GUINEA. 1944-12-04. AN AUSTRALIAN ARMY AMBULANCE CAREFULLY NEGOTIATING THE LOOSE SOIL ON THE EASTERN APPROACHES OF THE NEW BRIDGE ACROSS THE DRINIUMOR RIVER BUILT BY ENGINEER

BABIANG ROAD, AITAPE AREA, NEW GUINEA. 1944-12-04. PERSONNEL OF NO. 7 PLATOON, 2/8TH FIELD COMPANY, WORKING ON THE CONSTRUCTION OF A 60-FOOT BRIDGE ACROSS A STREAM NEAR DRINIUMOR ON THE AITAPE-BABIANG
