077604 Accession Number: 077604

Description

A GENERAL VIEW OF THE WATER DISTILLING PLANTS OPERATED BY NO. 2 PLATOON, 23RD FIELD COMPANY. EACH OF THESE PLANTS CAN TURN OUT 1000 GALLONS OF FRESH WATER PER HOUR. THE STORAGE TANKS AT THE REAR HOLD 15,000 GALLONS EACH.

Details

Accession Number
077604
Classification
Photograph
Object Type
Negative
Physical Description
Colour: Black & white
Support: Nitrate
Measurement
Overall: 3 1/4 in x 4 1/4 in
Image: 3 in x 4 in
Date Made
21 December 1944
Place Made
Whole/Part
Whole
Item Count
1
Copyright
Copyright expired - public domain

Conflicts

Places

Units

Tags

Accession 077604

More like this

077605

Photograph 077605 Second World War, 1939-1945

TWO OF THE 15,000 GALLON STORAGE TANKS USED BY NO. 2 PLATOON, 23RD FIELD COMPANY, TO STORE THE FRESH WATER WHICH THEY DISTIL FROM THE SALT WATER DRAWN FROM THE BEACH.

109115

Photograph 109115 Second World War, 1939-1945

LABUAN ISLAND. 12 JUNE 1945. MEMBERS OF 2/15 FIELD COMPANY, 1 AUSTRALIAN BEACH GROUP, CHECKING 8 CANVAS "S" TANKS WHICH HAVE BEEN INSTALLED IN THE GROUNDS OF GOVERNMENT HOUSE TO SUPPLY FRESH WATER TO

089562

Photograph 089562 Second World War, 1939-1945

MOROTAI, 1945-05-12. 2/1 BORING PLATOON PERSONNEL ALONGSIDE A 10 HORSE POWER BOOSTER PUMP, WITH AN OUTPUT OF 3,500 GALLONS PER HOUR, WHICH CARRIES WATER FROM THE STORAGE TANKS OPPOSITE THE 2/5 GENERAL

127122

Photograph 127122 Second World War, 1939-1945

CONCORD, NSW. 1946-04-29. PLUMBERS NX147256 SERGEANT S. DEANE AND LANCE CORPORAL F. P. GREENING, 5TH AUSTRALIAN HOSPITAL MAINTENANCE PLATOON, INSPECT THE STORAGE TANKS FOR THE MULTI BUILDINGS ON THE T

113367

Photograph 113367 Second World War, 1939-1945

TARAKAN ISLAND. 1945-08-01. TARAKAN WATER WORKS; SETTLING TANKS IN FOREGROUND AND MAIN STORAGE TANKS IN BACKGROUND. OVER 1,000,000 GALLONS OF TREATED WATER PER DAY IS BEING SUPPLIED TO TARAKAN TOWN.

085680

Photograph 085680 Second World War, 1939-1945

DARWIN, AUSTRALIA. 1945-01-24. THE INTERIOR OF ONE OF THE TWO BOOSTER PUMPING STATIONS WITHIN THE STORAGE AREA. EACH STATION OPERATED BY 2 AUSTRALIAN CHIEF ENGINEERS (WORKS) COMPRISES TWO PUMPS OF CAP

See more similar items →

Record information

Last modified: 1 May 2023 - 1.54 am