078094
Photograph 078094 Second World War, 1939-1945AITAPE, NEW GUINEA. 1944-12-26. PERSONNEL OF THE 2/14TH FIELD COMPANY, USING A SECTION OF A SMALL BOX GIRDER TO REPAIR A FLOOD DAMAGED BRIDGE ACROSS THE RIVER EAST OF THE TOWN.

The Australian War Memorial Collection. Test site
AITAPE, NEW GUINEA. 1944-12-26. THE CAMP AREA OF THE 2/14TH FIELD COMPANY, AND THE FLOOD DAMAGED APPROACHES TO THE BRIDGE ACROSS THE RIVER.
AITAPE, NEW GUINEA. 1944-12-26. PERSONNEL OF THE 2/14TH FIELD COMPANY, USING A SECTION OF A SMALL BOX GIRDER TO REPAIR A FLOOD DAMAGED BRIDGE ACROSS THE RIVER EAST OF THE TOWN.

AITAPE, NEW GUINEA. 1944-12-26. PERSONNEL OF THE 2/14TH FIELD COMPANY, USING A SECTION OF A BAILEY BRIDGE TO REPAIR A FLOOD DAMAGED BRIDGE ACROSS THE RIVER EAST OF THE TOWN. IDENTIFIED PERSONNEL ARE:-

AITAPE AREA, NEW GUINEA. 1944-12-04. A BRIDGE ACROSS SOLUM CREEK BUILT BY ENGINEERS OF NO. 10 PLATOON, 2/14TH FIELD COMPANY, ON THE AITAPE-DOGRETO ROAD.

BABIANG ROAD, AITAPE, NEW GUINEA. 1944-12-04. AN AUSTRALIAN ARMY AMBULANCE CAREFULLY NEGOTIATING THE LOOSE SOIL ON THE EASTERN APPROACHES OF THE NEW BRIDGE ACROSS THE DRINIUMOR RIVER BUILT BY ENGINEER

BABIANG ROAD, AITAPE AREA, NEW GUINEA. 1944-12-04. ENGINEERS OF NO. 9 PLATOON, 2/8TH FIELD COMPANY, BUILDING A COCONUT LOG BRIDGE ACROSS A STREAM ON THE AITAPE-DOGRETO ROAD.

BABIANG ROAD, AITAPE, NEW GUINEA. 1944-12-04. THIS 234 FEET HIGH-LEVEL BRIDGE ACROSS THE DRINIUMOR RIVER BUILT BY ENGINEERS OF NO. 7 PLATOON, 2/8TH FIELD COMPANY, IN TEN DAYS.
