083615 Accession Number: 083615

Description

DRINIUMOR RIVER, NEW GUINEA. 1944-11-23. IN A SCENE REMINISCENT OF A LUMBER CAMP, 7 PLATOON, 2/8 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, TROOPS TRIME PILES DURING THE CONSTRUCTION OF A BRIDGE ACROSS THE RIVER. IDENTIFIED PERSONNEL ARE:- SAPPER D. WHITING (1); SAPPERG.C. LOVELL (2); SAPPERH. PETTIGROW (3).

Details

Accession Number
083615
Classification
Photograph
Object Type
Negative
Physical Description
Colour: Black & white
Whole/Part
Whole
Item Count
1
Copyright
Copyright expired - public domain

Conflicts

Places

Units

Tags

Accession 083615

More like this

083613

Photograph 083613 Second World War, 1939-1945

DRINIUMOR RIVER, NEW GUINEA. 1944-11-23. TROOPS OF THE 2/8 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, ROLLING LOGS DURING THE CONSTRUCTION OF A BRIDGE ACROSS THE RIVER. IDENTIFIED PERSONNEL ARE:- SAPP

077467

Photograph 077467 Second World War, 1939-1945

BABIANG ROAD, AITAPE, NEW GUINEA. 1944-12-04. AN AUSTRALIAN ARMY AMBULANCE CAREFULLY NEGOTIATING THE LOOSE SOIL ON THE EASTERN APPROACHES OF THE NEW BRIDGE ACROSS THE DRINIUMOR RIVER BUILT BY ENGINEER

083612

Photograph 083612 Second World War, 1939-1945

DRINIUMOR RIVER, NEW GUINEA. 1944-11-23. THE NEW BRIDGE UNDER CONSTRUCTION BY TROOPS OF THE 2/8 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, ALONGSIDE THE OLD BRIDGE.

083617

Photograph 083617 Second World War, 1939-1945

DRINIUMOR RIVER, NEW GUINEA. 1944-11-23. LANCE CORPORAL R.G. SUTHERLAND, 2/22 FIELD PARK COMPANY, ROYAL AUSTRALIAN ENGINEERS, OPERATING A HIGH PRESSURE PUMP DURING THE CONSTRUCTION OF A BRIDGE ACROSS

083618

Photograph 083618 Second World War, 1939-1945

DRINIUMOR RIVER, NEW GUINEA. 1944-11-23. THE FIRST PILE ABUTMENTS BEING POSITIONED BY 2/8 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, TROOPS DURING THE INITIAL STAGES OF CONSTRUCTING A BRIDGE ACROSS TH

083420

Photograph 083420 Second World War, 1939-1945

AITAPE AREA, NEW GUINEA, 1944-11. TROOPS OF 22 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, USE WATER PRESSURE TO DRIVE PILES IN THE CONSTRUCTION OF A BRIDGE LOCATED APPROXIMATELY HALF WAY BETWEEN AITAP

See more similar items →

Record information

Last modified: 2 July 2026 - 1.41 am