083622 Accession Number: 083622

Description

ANAMO AREA, NEW GUINEA. 1944-11-23. TROOPS OF THE 2/2 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, LEVER LOGS INTO POSITION FOR THE ERECTION OF DECK SUPPORTS DURING BRIDGE CONSTRUCTION AT AN UNNAMED CREEK 400 YARDS SOUTH OF ANAMO. IDENTIFIED PERSONNEL ARE:- LANCE CORPORAL R. BUTLER (3); SAPPER L. BURNETT (4); SAPPERWIBLEN (5); SAPPERROSS (6).

Details

Accession Number
083622
Classification
Photograph
Object Type
Negative
Physical Description
Colour: Black & white
Whole/Part
Whole
Item Count
1
Copyright
Copyright expired - public domain

Conflicts

Places

Units

Tags

Accession 083622

More like this

083623

Photograph 083623 Second World War, 1939-1945

ANAMO AREA, NEW GUINEA. 1944-11-24. TROOPS OF THE 2/2 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, WITH MEMBERS FROM A PIONEER PLATOON, 2/4 INFANTRY BATTALION, LEVER LOGS INTO POSITION DURING BRIDGE CON

083619

Photograph 083619 Second World War, 1939-1945

ANAMO AREA, NEW GUINEA. 1944-11-23. 2/2 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS TROOPS ON BRIDGE CONSTRUCTION AT AN UNNAMED CREEK 400 YARDS SOUTH OF ANAMO.

083620

Photograph 083620 Second World War, 1939-1945

ANAMO AREA, NEW GUINEA. 1944-11-23. 2/2 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, TROOPS ON BRIDGE CONSTRUCTION AT AN UNNAMED CREEK 400 YARDS SOUTH OF ANAMO.

083621

Photograph 083621 Second World War, 1939-1945

ANAMO AREA, NEW GUINEA. 1944-11-23. 2/2 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, TROOPS VIEWED THROUGH A PILE DRIVER, SHOWING PROGRESS MADE IN 6 DAYS DURING BRIDGE CONSTRUCTION AT AN UNNAMED CREEK 4

083628

Photograph 083628 Second World War, 1939-1945

ANAMO AREA, NEW GUINEA. 1944-11-24. A BULLDOZER PUSHES UP EARTHWORKS TO THE EASTERN APPROACHES OF A BRIDGE DURING CONSTRUCTION WORK BY 2/2 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, TROOPS CROSS AN UN

083624

Photograph 083624 Second World War, 1939-1945

ANAMO AREA, NEW GUINEA. 1944-11-24. 2/2 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, TROOPS VIEWED FROM THE TOP OF A PILE DRIVER WORKING ON A HALF COMPLETED BRIDGE CONSTRUCTED ACROSS AN UNNAMED CREEK 40

See more similar items →

Record information

Last modified: 2 July 2026 - 1.41 am