086866 Accession Number: 086866

Description

MINBUM, QLD. 1945-02-19. 2 FIELD SQUADRON ROYAL AUSTRALIAN ENGINEERS TROOPS SQUARING AND ROUNDING THE DECK BEAM FOR A CLASS 24 BRIDGE OVER THE BEATRICE RIVER. THE BRIDGE, BUILT FOR THE EACHAM SHIRE COUNCIL AS AN EXERCISE, WILL BE OF 3 SPAN TOTALLING 30 FEET. IDENTIFIED PERSONNEL ARE:- SAPPER W K GERICKE, (1); SPR G L GRINING, (2); SPR J BEISLEY, (3).

Details

Accession Number
086866
Classification
Photograph
Object Type
Negative
Physical Description
Colour: Black & white
Whole/Part
Whole
Item Count
1
Copyright
Copyright expired - public domain

Conflicts

Places

Units

Tags

Accession 086866

More like this

086873

Photograph 086873 Second World War, 1939-1945

MINBUM, QLD. 1945-02-19. 2 FIELD SQUADRON ROYAL AUSTRALIAN ENGINEERS SAPPERS COMPLETES THE DECKING ON THE FIRST SPAN OF A 30 FOOT 3 SPAN BRIDGE CROSSING THE BEATRICE RIVER. THE CONSTRUCTION, DURING TR

086872

Photograph 086872 Second World War, 1939-1945

MAREEB, QLD. 1945-02-19. 2 FIELD SQUADRON ROYAL AUSTRALIAN ENGINEERS SAPPERS AT WORK IN THE BEATRICE RIVER TIGHTENING AND CUTTING BOLTS DURING THE CONSTRUCTION OF A BRIDGE FOR THE EACHAM SHIRE COUNCIL

086870

Photograph 086870 Second World War, 1939-1945

MAREEB, QLD. 1945-02-19. 2 FIELD SQUADRON ROYAL AUSTRALIAN ENGINEERS TROOPS CONSTRUCTING A BRIDGE ACROSS THE BEATRICE RIVER FOR THE EACHAM SHIRE COUNCIL. THE COUNCIL MAKES PAYMENT FOR THE TIMBER USED

086867

Photograph 086867 Second World War, 1939-1945

MINBUM, QLD. 1945-02-19. 2 FIELD SQUADRON ROYAL AUSTRALIAN ENGINEERS TROOPS AT MORNING TEA DURING THE CONSTRUCTION OF A BRIDGE ACROSS THE BEATRICE RIVER FOR THE EACHAM SHIRE COUNCIL. (FOR IDENTIFICATI

086546

Photograph 086546 Second World War, 1939-1945

MINBUM, QUEENSLAND. 1945-02-10. 2 FIELD SQUADRON, ROYAL AUSTRALIAN ENGINEERS TROOPS ASSISTED BY 2 MEDIUM REGIMENT ROYAL AUSTRALIAN ARTILLERY MEMBERS CONSTRUCTING A BRIDGE ACROSS THE BEATRICE RIVER. TH

E03711

Photograph E03711 First World War, 1914-1918

Members of the 12th Field Company of Australian Engineers at work on a bridge being built alongside a destroyed brick arch bridge. This structure, which was completed the following day, had a span of

See more similar items →

Record information

Last modified: 2 July 2026 - 1.47 am