053901
Photograph 053901 Second World War, 1939-1945PORT MORESBY, NEW GUINEA. 1943-07-14. PORTION OF THE OPEN WIRE ROUTE THROUGH OPEN COUNTRY CONSTRUCTED BY SIGNALS NEW GUINEA LINES OF COMMUNICATION.

The Australian War Memorial Collection. Test site
PORT MORESBY, NEW GUINEA. 1943-07-14. THIS CARRIER TERMINAL BUILDING WAS CONSTRUCTED BY THE ROYAL AUSTRALIAN ENGINEERS AT THE 5TH UNITED STATES ARMY AIR FORCE BASE, THE OPEN POLE AND WIRE ROUTE WAS ERECTED BY THE NEW GUINEA LINES OF COMMUNICATION, SIGNALS, AIF, AND THE 440TH UNITED STATES SIGNAL BATTALION. COMING OUT OF THE BUILDING ARE VX78812 SERGEANT D. O'REILLY (RIGHT) AND V270082 SIGNALLER C. K. CONSTABLE.
PORT MORESBY, NEW GUINEA. 1943-07-14. PORTION OF THE OPEN WIRE ROUTE THROUGH OPEN COUNTRY CONSTRUCTED BY SIGNALS NEW GUINEA LINES OF COMMUNICATION.

PORT MORESBY, NEW GUINEA. 1943-07-14. CARRIER TERMINAL BUILDINGS OF THE NEW GUINEA LINES OF COMMUNICATION, SIGNALS, AIF.

Port Moresby. 1944-03. An electric message conveyor designed to carry messages between Signal Office, 18th Australian Lines of Communication Signals and Headquarters, New Guinea Force. Messages in the

LAE, NEW GUINEA. 1944-04-03. MEMBERS OF THE 19TH LINES OF COMMUNICATION SIGNALS OUTSIDE THE LAE CARRIER TERMINAL HUT WHICH JOINS THE JUNGLE TELEGRAPH LINE BETWEEN LAE AND PORT MORESBY.

Port Moresby. 1944-03. An electric message conveyor designed to carry messages between Signal Office, 18th Australian Lines of Communication Signals and Headquarters, New Guinea Force. Messages in the

PORT MORESBY, NEW GUINEA. 1943-07-14. VX86697 SIGNALMAN W. DIXON OF THE NEW GUINEA LINES OF COMMUNICATION, SIGNALS, AIF, OPERATING A CS.5 3-CHANNEL CARRIER SYSTEM AND THE 4-CHANNEL TELEGRAPH TERMINALS
