053898
Photograph 053898 Second World War, 1939-1945PORT MORESBY, NEW GUINEA. 1943-07-14. POWER PANEL FOR CHARGING BATTERIES USED TO OPERATE THE CARRIER SYSTEM OF THE NEW GUINEA LINES OF COMMUNICATION, SIGNALS, AIF.

The Australian War Memorial Collection. Test site
PORT MORESBY, NEW GUINEA. 1943-07-14. VX86697 SIGNALMAN W. DIXON OF THE NEW GUINEA LINES OF COMMUNICATION, SIGNALS, AIF, OPERATING A CS.5 3-CHANNEL CARRIER SYSTEM AND THE 4-CHANNEL TELEGRAPH TERMINALS INSIDE THE BUILDING.
PORT MORESBY, NEW GUINEA. 1943-07-14. POWER PANEL FOR CHARGING BATTERIES USED TO OPERATE THE CARRIER SYSTEM OF THE NEW GUINEA LINES OF COMMUNICATION, SIGNALS, AIF.

PORT MORESBY, NEW GUINEA. 1943-07-14. CARRIER TERMINAL BUILDINGS OF THE NEW GUINEA LINES OF COMMUNICATION, SIGNALS, AIF.

PORT MORESBY, NEW GUINEA. 1943-07-14. SWITCHROOM AT HEADQUARTERS, NEW GUINEA LINES OF COMMUNICATION, SIGNALS, AIF, LEFT TO RIGHT: N318624 SIGNALMAN G. H. ROBERTS; NX116007 LANCE CORPORAL A. C. ROBINSO

PORT MORESBY, NEW GUINEA. 1943-07-14. THIS CARRIER TERMINAL BUILDING WAS CONSTRUCTED BY THE ROYAL AUSTRALIAN ENGINEERS AT THE 5TH UNITED STATES ARMY AIR FORCE BASE, THE OPEN POLE AND WIRE ROUTE WAS ER

LAE, NEW GUINEA. 1944-04-03. MEMBERS OF THE 19TH LINES OF COMMUNICATION SIGNALS OUTSIDE THE LAE CARRIER TERMINAL HUT WHICH JOINS THE JUNGLE TELEGRAPH LINE BETWEEN LAE AND PORT MORESBY.

PORT MORESBY, NEW GUINEA. 1943-07-14. PORTION OF THE OPEN WIRE ROUTE THROUGH OPEN COUNTRY CONSTRUCTED BY SIGNALS NEW GUINEA LINES OF COMMUNICATION.
