016196 Accession Number: 016196

Description

NEW GUINEA. FINSCHHAFEN AREA. AFTER HEAVY RAIN MANY BRIDGES WERE WASHED AWAY IMPOSING HEAVY TASKS ON OUR TROOPS. A FERRY PONTOON IS SHOWN BEING RIGGED TO TRANSPORT JEEPS ACROSS THE BUMI RIVER. TROOPS HAUL OUT TOW LINE FROM EITHER SIDE WHILE LOG RAMPS ARE PLACED IN POSITION.

Details

Accession Number
016196
Photographer
Captain Norman Brown
Classification
Photograph
Object Type
Negative
Physical Description
Colour: Black & white
Date Made
c November 1943
Place Made
Whole/Part
Whole
Item Count
1
Copyright
Copyright expired - public domain

Conflicts

Places

Accession 016196

More like this

016200

Photograph 016200 Second World War, 1939-1945

Finschhafen Area, New Guinea. A ferry pontoon being rigged across the Bumi River to transport jeeps and facilitate supplies. Log ramps were placed on the ferry each trip for the run off.

061078

Photograph 061078 Second World War, 1939-1945

FINSCHHAFEN AREA, NEW GUINEA. 1943-11-11. RECENT HEAVY RAINS WASHED AWAY THE BRIDGE OVER THE BUMI RIVER, SO UNTIL A NEW BRIDGE CAN BE BUILT BY THE 2/3RD AUSTRALIAN FIELD COMPANY, ROYAL AUSTRALIAN ENGI

075044

Photograph 075044 Second World War, 1939-1945

LAE, NEW GUINEA. 1944-08-09. TROOPS OF THE 20TH FIELD COMPANY, USING A LARGE MOBILE CRANE TO HAUL A STEEL BOX GIRDER SECTION OF THE NEW BRIDGE ACROSS THE BUTIBUM RIVER WHERE THE OLD WOODEN BRIDGE WAS

075043

Photograph 075043 Second World War, 1939-1945

LAE, NEW GUINEA. 1944-08-09. TROOPS OF THE 20TH FIELD COMPANY, MAKING FAST THE END OF A STEEL BOX GIRDER TO THE CRANE WHICH IS TO HAUL THE GIRDER ACROSS THE GAP WHERE THE OLD WOODEN BRIDGE WAS WASHED

016161

Photograph 016161 Second World War, 1939-1945

Finschhafen, New Guinea. A bulldozer builds up a crossing in the Quoja River on the main track to the forward areas from Finschhafen. The crossing had been washed away by heavy flood waters the previo

075045

Photograph 075045 Second World War, 1939-1945

LAE, NEW GUINEA. 1944-08-09. TROOPS OF THE 20TH FIELD COMPANY, "JOCKEYING" A STEEL GIRDER INTO POSITION DURING THE BUILDING OF A NEW BRIDGE ACROSS THE BUTIBUM RIVER TO REPLACE THE OLD WOODEN ONE WHICH

See more similar items →

Record information

Last modified: 21 July 2026 - 5.32 am