061078 Accession Number: 061078

Description

FINSCHHAFEN AREA, NEW GUINEA. 1943-11-11. RECENT HEAVY RAINS WASHED AWAY THE BRIDGE OVER THE BUMI RIVER, SO UNTIL A NEW BRIDGE CAN BE BUILT BY THE 2/3RD AUSTRALIAN FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS, ALL TRAFFIC MUST BE TAKEN ACROSS THE RIVER BY MEANS OF A PONTOON BRIDGE OR BARGE. THIS PHOTOGRAPH SHOWS MEMBERS OF THE 2/3RD AUSTRALIAN ANTI-MALARIAL CONTROL UNIT CROSSING THE RIVER.

Details

Accession Number
061078
Classification
Photograph
Object Type
Negative
Physical Description
Colour: Black & white
Whole/Part
Whole
Item Count
1
Copyright
Copyright expired - public domain

Conflicts

Places

Tags

Accession 061078

More like this

061605

Photograph 061605 Second World War, 1939-1945

BUMI RIVER, FINSCHHAFEN AREA, NEW GUINEA. 1943-11-24. A PILE BEING HAULED INTO POSITION FOR DRIVING DURING THE CONSTRUCTION OF A BRIDGE ACROSS THE BUMI RIVER BY ENGINEERS OF THE 2/3RD AUSTRALIAN FIELD

061606

Photograph 061606 Second World War, 1939-1945

BUMI RIVER, FINSCHHAFEN AREA, NEW GUINEA. 1943-11-24. A PILE BEING HAULED INTO POSITION FOR DRIVING DURING THE CONSTRUCTION OF A BRIDGE ACROSS THE BUMI RIVER BY ENGINEERS OF THE 2/3RD AUSTRALIAN FIELD

061607

Photograph 061607 Second World War, 1939-1945

BUMI RIVER, FINSCHHAFEN AREA, NEW GUINEA. 1943-11-24. A PILE BEING HAULED INTO POSITION FOR DRIVING DURING THE CONSTRUCTION OF A BRIDGE ACROSS THE BUMI RIVER BY ENGINEERS OF THE 2/3RD AUSTRALIAN FIELD

061604

Photograph 061604 Second World War, 1939-1945

BUMI RIVER, FINSCHHAFEN AREA, NEW GUINEA. 1943-11-24. PILE DRIVER FRAME BEING TRUED UP IN PREPARATION FOR THE DRIVING OF PILES FOR A BRIDGE ACROSS THE BUMI RIVER BY ENGINEERS OF THE 2/3RD AUSTRALIAN F

016196

Photograph 016196 Second World War, 1939-1945

NEW GUINEA. FINSCHHAFEN AREA. AFTER HEAVY RAIN MANY BRIDGES WERE WASHED AWAY IMPOSING HEAVY TASKS ON OUR TROOPS. A FERRY PONTOON IS SHOWN BEING RIGGED TO TRANSPORT JEEPS ACROSS THE BUMI RIVER. TROOPS

075047

Photograph 075047 Second World War, 1939-1945

LAE, NEW GUINEA. 1944-08-09. AUSTRALIAN AND AMERICAN TROOPS CROSSING THE FIRST SPAN OF THE NEW BRIDGE ACROSS THE BUTIBUM RIVER WHICH IS BEING BUILT BY THE 20TH FIELD COMPANY, TO REPLACE THE OLD WOODEN

See more similar items →

Record information

Last modified: 24 June 2026 - 4.11 am