092659 Accession Number: 092659

Description

MINGA CREEK, WEWAK AREA, NEW GUINEA. 1945-05-30. CORPORAL M. HOBBY, 2/8 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, USING WATER PRESSURE TO AID IN SINKING A PILE. WATER IS PUMPED UNDER PRESSURE INTO THE U SHAPED PIPE THE ENGINEER IS USING. THIS PROCESS IS KNOWN AS PILE JETTING AND IT WAS USED SUCCESSFULLY AND EXTENSIVELY IN THIS CAMPAIGN.

Details

Accession Number
092659
Classification
Photograph
Object Type
Negative
Physical Description
Colour: Black & white
Whole/Part
Whole
Item Count
1
Copyright
Copyright expired - public domain

Conflicts

Places

Units

Tags

Accession 092659

More like this

092661

Photograph 092661 Second World War, 1939-1945

MINGA CREEK, WEWAK AREA, NEW GUINEA. 1945-05-30. SAPPERS OF 2/8 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, USING A PORTABLE PILE DRIVER DURING BRIDGE BUILDING CONSTRUCTION. THIS PILE, SEVEN FEET LONG,

092657

Photograph 092657 Second World War, 1939-1945

MINGA CREEK, WEWAK AREA, NEW GUINEA. 1945-05-30. MEMBERS OF 9 PLATOON, 2/8 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, HOISTING A HEAVY PILE UP ON A PILE DRIVER WHICH IS MOUNTED ON A 3-TON TRUCK AT MING

092662

Photograph 092662 Second World War, 1939-1945

MINGA CREEK, WEWAK AREA, NEW GUINEA. 1945-05-30. SAPPERS OF 2/8 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, USING A PORTABLE PILE DRIVER DURING BRIDGE BUILDING CONSTRUCTION. THE "DOLLY" IS RAISED TO A H

092658

Photograph 092658 Second World War, 1939-1945

MINGA CREEK, WEWAK AREA, NEW GUINEA. 1945-05-30. A TEMPORARY PONTOON BRIDGE IN THE MINGA CREEK AREA, CONSTRUCTED BY 2/8 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, UNDER COVER OF DARKNESS PRIOR TO THE S

083610

Photograph 083610 Second World War, 1939-1945

DRINIUMOR RIVER, NEW GUINEA. 1944-11-23. 2/8 FIELD COMPANY, ROYAL AUSTRALIAN ENGINEERS TROOPS SINKING PILES USING A PILE DRIVER MOUNTED ON A THREE TON TRUCK AND WATER PRESSURE.

092013

Photograph 092013 Second World War, 1939-1945

WEWAK POINT, NEW GUINEA, 1945-05-12. THE 25-POUNDER OF 2/2 FIELD REGIMENT, ROYAL AUSTRALIAN ARMY, MOVING OVER THE BRIDGE OVER MINGA CREEK ON THE ROAD TO WEWAK POINT. THIS BRIDGE WAS BUILT BY 2/8 FIELD

See more similar items →

Record information

Last modified: 2 July 2026 - 2.05 am