Description

BOUGAINVILLE. 1945-05-30. THE SAVIGE BRIDGE CONSTRUCTED BY 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, OVER THE JABA RIVER. THIS BRIDGE, MEASURING 620 FEET LONG AS A GUARD AGAINST FLOOD WATERS, OPENS THE SUPPLY ROUTE TO TROOPS IN SOUTH BOUGAINVILLE. A 3-TON VEHICLE IS SEEN TOWING A 25-POUNDER OF 2/11 FIELD REGIMENT, OVER THE BRIDGE.

Details

Accession Number
092669
Classification
Photograph
Object Type
Negative
Physical Description
Colour: Black & white
Support: Nitrate
Measurement
Overall: 3 1/8 in x 4 3/8 in
Image: 2 15/16 in x 3 15/16 in
Whole/Part
Whole
Item Count
1
Copyright
Copyright expired - public domain

People

Conflicts

Places

Units

Tags

Accession 092669

More like this

092670

Photograph 092670 Second World War, 1939-1945

BOUGAINVILLE. 1945-05-30. VEHICLES OF 2/11 FIELD REGIMENT, ROYAL AUSTRALIAN ENGINEERS, CROSSING THE NEWLY CONSTRUCTED SAVIGE BRIDGE OVER THE JABA RIVER. THIS BRIDGE, MEASURING 620 FEET LONG AS A GUARD

092668

Photograph 092668 Second World War, 1939-1945

BOUGAINVILLE. 1945-05-30. SAPPERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, USING A PILE DRIVER ERECTED ON PONTOONS TO DRIVE PILES TO ANCHOR THE NEWLY CONSTRUCTED SAVIGE BRIDGE OVER THE JABA RIV

092667

Photograph 092667 Second World War, 1939-1945

BOUGAINVILLE. 1945-05-30. A NEWLY CONSTRUCTED SAVIGE COMMERCIAL BOX GIRDER BRIDGE OVER THE JABA RIVER WHICH WAS ASSEMBLED BY 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, TO REPLACE A BRIDGE WASHED OUT

092594

Photograph 092594 Second World War, 1939-1945

SOUTH BOUGAINVILLE, 1945-05-27. ENGINEERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, WORKING ON THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER. CONSTRUCTED IN FIVE WEEKS, THE BRIDGE MEASURES 620 FEE

092593

Photograph 092593 Second World War, 1939-1945

SOUTH BOUGAINVILLE. 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER NEARING COMPLETION. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IN FIVE WEEKS, THE BRIDGE MEASURE

092595

Photograph 092595 Second World War, 1939-1945

SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IT WAS COMPLETED IN FIVE WEEKS AND