BOUGAINVILLE. 1945-05-30. VEHICLES OF 2/11 FIELD REGIMENT, ROYAL AUSTRALIAN ENGINEERS, CROSSING THE NEWLY CONSTRUCTED SAVIGE BRIDGE OVER THE JABA RIVER. THIS BRIDGE, MEASURING 620 FEET LONG AS A GUARD AGAINST FLOOD WATERS, WAS CONSTRUCTED BY 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS. IT OPENS THE SUPPLY ROUTE TO TROOPS IN SOUTH BOUGAINVILLE.

Details

Accession Number
092670
Classification
Photograph
Object Type
Negative
Physical Description
Colour: Black & white
Whole/Part
Whole
Item Count
1
Copyright
Copyright expired - public domain

People

Conflicts

Places

Units

Tags

Accession 092670

More like this

092669

Photograph 092669 Second World War, 1939-1945

BOUGAINVILLE. 1945-05-30. THE SAVIGE BRIDGE CONSTRUCTED BY 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, OVER THE JABA RIVER. THIS BRIDGE, MEASURING 620 FEET LONG AS A GUARD AGAINST FLOOD WATERS, OPENS

092668

Photograph 092668 Second World War, 1939-1945

BOUGAINVILLE. 1945-05-30. SAPPERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, USING A PILE DRIVER ERECTED ON PONTOONS TO DRIVE PILES TO ANCHOR THE NEWLY CONSTRUCTED SAVIGE BRIDGE OVER THE JABA RIV

092667

Photograph 092667 Second World War, 1939-1945

BOUGAINVILLE. 1945-05-30. A NEWLY CONSTRUCTED SAVIGE COMMERCIAL BOX GIRDER BRIDGE OVER THE JABA RIVER WHICH WAS ASSEMBLED BY 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, TO REPLACE A BRIDGE WASHED OUT

092594

Photograph 092594 Second World War, 1939-1945

SOUTH BOUGAINVILLE, 1945-05-27. ENGINEERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, WORKING ON THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER. CONSTRUCTED IN FIVE WEEKS, THE BRIDGE MEASURES 620 FEE

092593

Photograph 092593 Second World War, 1939-1945

SOUTH BOUGAINVILLE. 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER NEARING COMPLETION. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IN FIVE WEEKS, THE BRIDGE MEASURE

092595

Photograph 092595 Second World War, 1939-1945

SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IT WAS COMPLETED IN FIVE WEEKS AND